Industry trends HomeIndustry trends
Click:Release date:2023/3/8
Building formwork is an indispensable material in today's building materials. In the construction unit, special personnel shall be assigned to save the building formwork. However, there are many small enterprises and small contractors who do not have special personnel to keep and maintain them. Damage and cracking may occur during use, resulting in loss.
When building formwork is used for the first time, alloy saw blade with more than 100 teeth and edge saw with rail shall be used when cutting formwork. If you need building templates of different shapes and sizes, you should use a portable electric saw to cut them. After the construction formwork is cut and punched, the cut must be sealed with edge sealing paint to prevent the formwork from deformation and cracking due to water absorption. In addition, when nailing or punching holes on the formwork, it is necessary to pad the wooden square under the board, so as to prevent the crack marks on the back of the board due to hanging;
When using building formwork, attention should be paid to prevent metal edges and corners from being scratched, bruised and falling on the surface. In addition, attention must be paid to ensure the collection shape and surface integrity of multilayered plates and laminates. The formwork shall be stored in a flat and dry place on the construction site and shall not be exposed to rain and sunlight. It is necessary to avoid using it in places with end temperature and humidity.
1. When starting to use the building template, if it is necessary to cut and punch holes, it is necessary to seal the cut with special edge sealing agent. When punching holes, it is necessary to place wooden blocks under the building template to prevent cracks in the building template. At the same time, attention should be paid to ensure the integrity of the building formwork.
2. After the formwork is removed, the surface dirt shall be removed with a scraper. If it needs long-term storage, we need to apply some oil on its surface. The poncho shall be covered during storage. At the same time, the formwork shall be placed flat on the ground.
Therefore, if the foundation work is completed, there will be no problems in the use of building formwork, and the maintenance work can also play its due role in the use of building formwork.
Navigation
Contact us
  • Linyi Xuanjie Trading Co., Ltd.
  • 86 15910178693
  • 86 14705390366
  • 6/F, Unit 1, Building 1, Guanya Shangcheng, Linyi Economic Development Zone, Linyi City, Shandong Province China
Leaving a message